Extracción de Agua de Pozo
Extracción de Agua de Pozo a 200 Metros de Profundidad
Caso de Estudio Nº
24
Cliente
|
Condiciones Operativas:
Tuberías Utilizadas:
Uso:
Largo
Categorías
The Challenge
Collahuasi Mine extracted process water through wells, they used a galvanized steel pipe. This pipe had several failures on its joints and demanded a long time installation process (around 3 days).
The client required a more flexible pipe, with longer working life than the steel, in order to keep the operations stable and minimized the stops in the plant for maintenance.
Pexgol Solution
A Pexgol pipe was installed in less than 3 hours, reducing 24 times the average installation time. Its weight was lighter than steel (70% less), so it involved less workers, less tolls, and less equipment to leave the well full operative. During the working life of the well, the Pexgol pipe didn’t require any sort of maintenance, and it was employed after in another application at the plant.
Casos de Estudio Relacionados
Transformando el Transporte de Relaves: La Ventaja de Pexgol
|
Pexgol y Mowi: Una historia de éxito en innovación acuícola
|
Reemplazo de Tubería Metálica por PE-X para Agua de Formación
|
Reemplazo de un Spool de Acero por Pexgol
|